Determination of the elevation of the main flat mouth
2024-09-26 22:00:58
  From the perspective of mineral deposit development, the lower the elevation of the main flat shovel, the more reserves will be developed with the flat raft. However, the elevation of the main level is often limited by the elevation of the ore deposit of the ground mine, which must be adapted to the elevation of the mine.
When the ore main adit electric locomotive directly transported to bunker by beneficiation plant, the main adit port downhill elevation should reach 3 ~ 4 ‰ receiving bunker receiving mine mouth elevation; the use of automobiles or belt When the conveyor is transported, it is determined by the terrain and the allowable running slope of the equipment. Sometimes the ore needs to be shipped out, and the ore level of the mine bin is related to the loading height (with or without a mine bin) (loading a train or loading a car); if it is transported by an aerial ropeway, the elevation of the mine mouth It should be able to meet the needs of the height difference of the coarse, medium and ropeway stations. When the elevation of the selected plant is very different from the height of the main flat, the ore needs to be transported to reach the plant. At this time, it is determined only by the reasonable elevation of the main flat.
In some mines, the main flat sluice and the concentrating plant are uncoordinated by the ore level of the mine bin, causing the electric car to move uphill, thus affecting the traction of the electric car. In addition to special conditions, it should generally be avoided.Cork Gasket Making,Gasket Cutter Machine,Cork Gasket Cutting Machine,Cork Gasket Cutting Tool
Jinan Zhuoxing Intelligent Technology Co., Ltd. , https://www.zhuoxingcutting.com