The electric wind is valued. Germany will carry out large-scale power grid construction.
According to reports, German Chancellor Angela Merkel stated clearly at the end of his "Energy Expedition Tour" that it is necessary to massively expand the grid in Germany in order to achieve a complete transition to clean energy. However, at present, the expansion of the power grid still cannot keep pace with the development of different energy sources. Therefore, it is not possible to realize the transportation of wind energy from north to south. Merkel said that the government must be prepared to invest in building new infrastructure. For this reason, a large sum of money is necessary.
In terms of energy options, the government did not give a clear statement. According to the "Stuttgart" report, the high-level dialogue in the Prime Minister's Office mentioned that the operating period was extended by 10 years. And Merkel said to this statement, "There is no final conclusion."
Equally unclear is the issue of the amount of money the nuclear power group has to pay to extend the operation time of nuclear power plants. Merkel is reluctant to put “tax†on the lips and choose to use the term “sponsorshipâ€. Is voluntary behavior or obligation to pay taxes? The only certainty is that because of the extension of nuclear power plant operating hours, the energy group must pay a portion of its profits.
Construction Hoist Steel Structure
Construction Hoist Steel Structure means the construction hoist spare parts like Construction Hoist Mast Section, Passenger Hoist Cage, Construction Hoist Wall Tie and so on.
The length of each mast section is 1508mm, the rack is fixed on the mast by three bolts and it can be exchanged. For the single cage hoist there is only one rack on the mast section, and the mast section can be used for the double cages hoist by increasing one rack. The section of the mast is diverse, select one type section according to different hoist. The mast sections are bolted together with M24 bolts and nuts to form mast. The mast is tied to the building with tie-in and is the guide rail of the cage. According to the user`s or circumstance`s request, surface of mast is hot dip galvanized, which can prevent it rusting.
The tie-in(wall tie) is the linked part between mast and building, to keep the stabilization of the mast. Distance between the tie-in is about 6~9m alone the mast. There are several types of tie-in. Select one of them according to need, tie-in can adjust the vertical of mast in definite ranges. According to the user`s or circumstance`s request, surface of the tie-in is hot dip galvanized, which can prevent it rusting.
The cage dimension(L×W×H)(m): 3×1.5×2.5. We can also manufacture cages of other size according to the user`s needs. The material of the cage and the door material can be steel wire weave, aluminum-plastic panel, punched-plate, figured aluminum board or other type according to user`s needs. The gate is equipped with drawing gate,include small turn over gate.
Construction Hoist Mast Section,Building Hoist Mast Section,Passenger Hoist Cage,Construction Hoist Wall Tie, Construction Hoist Anchorage Frame
SHEN YANG BAOQUAN BUSINESS CO., LTD , https://www.syconstructionhoist.com