Problems that should be paid attention to in chartered cargo transportation

To apply for charter flights, contact the carrier to negotiate chartered transportation conditions with the unit introduction letter or personal valid identity document, and sign the charter contract after the two parties agree. The charterer and the carrier shall perform their respective responsibilities and obligations as stipulated in the charter contract.
When the charter flight operator and the carrier perform the charter flight contract, each charter flight charter shall fill in a shipping paper and a freight order as the transport document for the charter flight.
The charterer and the carrier can visually determine the nature of the goods and determine that the escort and escort will use the charter contract to handle the ticket and proceed with the check-in procedures as required.
The tonnage of the aircraft is fully utilized by the charterers. If the carrier needs to use the remaining tonnage of the charter, it should consult with the charterer.
After the signing of the charter contract, the shipper and the carrier shall bear the economic responsibilities stipulated in the charter contract, except for weather or other force majeure reasons. Before the charterer proposes to change the chartered aircraft, the carrier shall bear the relevant expenses incurred by the carrier for the commissioning of the aircraft as a result of performing the chartered mission.
With the aircraft in the package, the carrier will charge fees according to the agreement between the charter and the aircraft.
The signing of the contract for the application of the baggage or package pallets (boxes) and the responsibilities and obligations that the two parties should assume shall be handled in accordance with the relevant provisions of the chartered aircraft.
Gas Metal Arc Welding Wire Production Line
WELDING WIRE DRAWING AND CUTTER MACHINE LINE
1-ROD WIRE PRETREATMENT(PAY OFF+DESCALER MACHINE+SAND BELT MACHINE)
2-ROUGH WIRE DRAWING MCHINE LZ560
3-HIGH SPEED STRAIGHTENER AND CUTTER MACHINE
4-THE FINISHED WIRE Φ2.50X350 Φ3.25X350 Φ4.0X450mm.
WE CAN MAKE THE WELDING WIRE ACCORDING TO THE BUYERS REQUIREMENTS
5.THE FIRST YEAR SERVICE INCLUDE THE SPAREPART IS FREELY SERVICE(BUT NOT INCLUDE THE BUYERS DELIBERATELY BREAKS THE MACHINE OR PARTS),THE SECOND AND THIRD YEAR JUST PAY THE PARTS COST.THE SELLER MUST OFFER THE LIFE-SERVICE FOR THE MACHINE LINE.
6.THE SELLER MUST GUARANTEE TO PRODUCE THE GOOD QUALITY FINISHED WELDING WIRE.
THE SELLER MUST OFFER THE ELECTRICITY MAP,TOUCH SCREEN,AND MANUAL BOOKS,MAINTAIN BOOKS,AND OTHER TECHNICAL DETAILS WITH ENGLISH.TRAIN THE BUYERS WORKERS TO MASTER THE MACHINE
7.SEA WORTHY PACKING, BIG MACHINES WRAPPED WITH PLASTIC NYLON, SMALL MACHINES AND PRECISION MACHINE MUST PACKED IN PLYWOOD BOXES THEN FIXED IN THE CONTAINER
Gas Metal Arc Welding Wire Production Line,Welding Wire Production Equipment Line,Production Line For Wire Barrel Packaging,Welding Wire Copper Plating Machinery=Proper(B10)
Jiangyin Wanyi Machinery CO.,Ltd , https://www.wydrawmachine.com